Title: Manager (Textile IE)
Company Name: A well reputed company
Vacancy: 1
Age: 30 to 40 years
Location: Gazipur
Salary: Negotiable
Experience:
∎ 8 to 10 years
Published: 1 May 2025
Education:
∎ Masters
Requirements:
Additional Requirements:
∎ Age 30 to 40 years
∎ B.Sc. Engineering in IPE/Textile from reputed public or private university.
∎ At least 8/10 years of experience in IE at Textile- Dyeing & Finishing, Knitting section.
∎ Having Knowledge on Lean Six Sigma will get preference.
∎ B.Sc. Engineering in IPE/Textile from reputed public or private university.
∎ At least 8/10 years of experience in IE at Textile- Dyeing & Finishing, Knitting section.
∎ Having Knowledge on Lean Six Sigma will get preference.
Responsibilities & Context:
∎ Responsible to optimize the productivity focusing production efficiency improvement and cost reduction with effective utilization of industrial engineering principles, methods, tools and techniques.
∎ Review skill assessment of new recruited workers of textile and also review salary fixation based on skill.
∎ Set Manpower Budget of Garments as per Plan Requirement & Proceed Requisition for recruitment if needed for shortage or replacement.
∎ Coordinate to keep update skill matrix of all workers.
∎ Find out standard capacity, review current trend of capacity utilization and take steps to optimize it.
∎ Observe installed loading capacity of dyeing & finishing machines in kg.
∎ Make study and set an achievable loading capacity of dyeing and finishing machines in kg.
∎ Make study and set an achievable loading capacity of dyeing and finishing machines in hours per kg (which will follow a generic formula).
∎ Make study and set maximum percentage of loading in dyeing and finishing machines based on various type of color and fabrication against installed capacity.
∎ Make time study and set standard processing time (SPT) of required processes of dyeing and finishing for each fabric item (color with fabrication).
∎ Make an efficiency and a performance study of dyeing and finishing machines and also make an comparison study of dyeing/ finishing machines.
∎ Make a detail comparison report analyzing installed capacity, achievable capacity, achieved production, used hours, lost hours etc,
∎ Make SPT report (with required processes and SPT for each processes) of dyeing and finishing for each fabric order.
∎ Measure & Analyze product/material, process/operation, cycle time, processing time and set method and time standard.
∎ Coordinate to reduce NPT consulting all responsible department.
∎ Reduce non value adding activities & drive to create Standardization and Simplication of Process.
∎ Facilitate and promote kaizen events into the factory.
∎ Prepare and implement master rollout plan to train all employees to develop their skills.
∎ Set KPIs for measuring factory performance and Plan to improve the performance.
∎ Undertake continuous process improvement initiatives such as Lean/JIT, Six Sigma/ TQM, TPM etc as an companywide problem solving campaign scheme by forming small groups/ cross functional teams/ QC circles.
∎ Build up small groups or team or circle with specific objective, monitor, assess the groups keeping in mind sustainable system development.
∎ Take necessary study and step to develop sustainable system to enhance overall Performance, waste and cost reduction.
∎ Drive continuously to reduce wastes, delays, variations and defects from the processes.
∎ Responsible to optimize the productivity focusing production efficiency improvement and cost reduction with effective utilization of industrial engineering principles, methods, tools and techniques.
∎ Review skill assessment of new recruited workers of textile and also review salary fixation based on skill.
∎ Set Manpower Budget of Garments as per Plan Requirement & Proceed Requisition for recruitment if needed for shortage or replacement.
∎ Coordinate to keep update skill matrix of all workers.
∎ Find out standard capacity, review current trend of capacity utilization and take steps to optimize it.
∎ Observe installed loading capacity of dyeing & finishing machines in kg.
∎ Make study and set an achievable loading capacity of dyeing and finishing machines in kg.
∎ Make study and set an achievable loading capacity of dyeing and finishing machines in hours per kg (which will follow a generic formula).
∎ Make study and set maximum percentage of loading in dyeing and finishing machines based on various type of color and fabrication against installed capacity.
∎ Make time study and set standard processing time (SPT) of required processes of dyeing and finishing for each fabric item (color with fabrication).
∎ Make an efficiency and a performance study of dyeing and finishing machines and also make an comparison study of dyeing/ finishing machines.
∎ Make a detail comparison report analyzing installed capacity, achievable capacity, achieved production, used hours, lost hours etc,
∎ Make SPT report (with required processes and SPT for each processes) of dyeing and finishing for each fabric order.
∎ Measure & Analyze product/material, process/operation, cycle time, processing time and set method and time standard.
∎ Coordinate to reduce NPT consulting all responsible department.
∎ Reduce non value adding activities & drive to create Standardization and Simplication of Process.
∎ Facilitate and promote kaizen events into the factory.
∎ Prepare and implement master rollout plan to train all employees to develop their skills.
∎ Set KPIs for measuring factory performance and Plan to improve the performance.
∎ Undertake continuous process improvement initiatives such as Lean/JIT, Six Sigma/ TQM, TPM etc as an companywide problem solving campaign scheme by forming small groups/ cross functional teams/ QC circles.
∎ Build up small groups or team or circle with specific objective, monitor, assess the groups keeping in mind sustainable system development.
∎ Take necessary study and step to develop sustainable system to enhance overall Performance, waste and cost reduction.
∎ Drive continuously to reduce wastes, delays, variations and defects from the processes.
Compensation & Other Benefits:
∎ Other benefits as per company policy.
∎ Other benefits as per company policy.
Workplace:
∎ Work at office
Employment Status: Full Time
Job Location: Gazipur
Read Before Apply:
B.Sc. Engineering in IPE/Textile from reputed public or private university.